PV System Installation Steps I SS1 Solar Photovoltaic Installation & Maintenance Lesson Note
Download Lesson Note
Lesson Notes
Topic: PV System Installation Steps I
Preparation – Safety and Site Set-up
Before we climb any ladder, we must remember that a solar panel is like a giant sail. If the wind catches it while you are on the roof, it can pull you off.
- Personal Protective Equipment (PPE):
- Safety Boots: To avoid slipping on the roof.
- Hand Gloves: Solar panels get very hot in the Nigerian sun!
- Safety Harness: A rope that ties you to the building so you don’t fall.
- Organizing the “Work Zone”: Don’t just scatter tools everywhere. Keep your batteries in a cool, dry place and keep your panels in their boxes until the moment they are ready to go up.
Step 1 – Mounting the Panels (The Foundation)
The goal is to make sure the panels stay on the roof for 25 years without moving, even during the heaviest rainstorm.
- Fixing the Rails: We don’t just screw panels into the roof. We install Aluminum Rails first. These rails are bolted into the wooden or metal beams (purlins) under the roofing sheets.
- Tip: Always use a Spirit Level to make sure the rails are straight.
- Laying the Panels: We lift the panels carefully and place them on the rails. We use End Clamps and Mid Clamps to “pinch” the panels tightly onto the rails.
- Direction Check: Use your compass one last time to make sure they are facing South.
Step 2 – Installing the “Balance of System” (BOS)
“Balance of System” is just a professional way of saying “everything else except the panels.” This includes the Inverter, the Controller, and the Protection boxes.
- Mounting the Inverter and Controller:
- Location: They must be in a well-ventilated room. These machines get hot when they work. Never hide them in a tiny cupboard without air!
- Height: Mount them at eye level so you can easily read the screens and see if there is an error.
- The Distribution Board (DB Box): We install a small plastic or metal box near the inverter. This is where we put our Circuit Breakers and Surge Protectors. It keeps the “safety guards” all in one place.
Step 3 – Management of Cables (The Veins)
If your wires look like a “plate of noodles” (tangled), the system will be hard to fix later and could be dangerous.
- Using Conduits: On the roof, we put wires inside flexible pipes. This protects them from the sun and from being rubbed against sharp roof edges.
- Entering the House: When the wires come from the roof into the house, we use a “Drip Loop.” This is a small curve in the wire that makes rain-water fall off the wire onto the ground instead of following the wire inside the house to soak your inverter.
- Trunking: Inside the house, use white plastic covers (trunking) to hide the wires along the wall. It makes the job look like a professional did it!
Summary and Class Activity
The Installer’s “Three Golden Rules”
- Never walk on the panels: You might not see a crack, but you will break the tiny “cells” inside.
- Tighten every screw: A loose screw creates heat, and heat creates fire.
- Stay Clean: Use a soft cloth to wipe your fingerprints off the panels once you are done.
Class Practical Activity
- The Spirit Level Challenge: Practice using a spirit level on a desk or a window frame. If the “bubble” is in the middle, it’s straight.
- Tool Identification: Lay out a spanner, a screwdriver, a clamp, and a rail. Can the students name them and explain what they do on the roof?
- The “Drip Loop” Drawing: Ask the students to draw a house with a solar panel and show how the wire should enter the wall so that rain doesn’t get inside.