Final Year Project Supervision – SS3 Computer Hardware & GSM Repair Lesson Note (Third Term)
Lesson note at a glance
- Class
- SS3
- Subject
- Computer Hardware & GSM Repair
- Term
- Third Term
- Reading time
- 6 min
A project proposal is a short written plan, usually one or two pages, that you give your supervisor for approval before you spend any money on your project.
- Subject: Computer Hardware and GSM Repair
- Class: SS3
- Topic: Final Year Project Supervision (Proposal Writing and Getting Your Project Approved)
Behavioural objectives
By the end of the lesson, students should be able to:
- explain what a project proposal is and why it is written;
- list and describe the six parts of a good proposal;
- prepare for and behave properly in a meeting with a supervisor;
- state the main reasons a proposal is rejected and what to do afterwards;
- use a checklist to review a proposal before submission;
- describe what happens during supervision after the proposal is approved.
What is a project proposal?
A proposal is a written plan that asks your supervisor for permission to start your final year project.
- What it states: the problem you found, how you plan to fix it, and the money and time you need.
- What it is like: a written promise of what you will do, so your supervisor knows your plan before you begin.
- What approval means: once your supervisor signs it, you can officially begin.
- Why it matters: without approval, you are only playing with tools. With approval, you are doing a project.
Why do we write a proposal?
We write a proposal to catch mistakes early, get expert advice and show that we are ready.
- To avoid waste: your supervisor may see a mistake in your plan before you start. It is better to change a word on paper than to burn a ₦20,000 chip.
- To get advice: your supervisor has years of experience and may suggest a better tool or a faster way to reach your goal.
- To prove you are ready: it shows you have done your research and are not just guessing.
What are the parts of a good proposal?
A good proposal has six parts: project title, problem statement, objectives, methodology, required materials and expected outcome.
You do not need “big grammar”. You need to be clear and simple.
| Part | Question it answers | Example |
|---|---|---|
| 1. Project title | What is the name of your work? | “Design and Implementation of a Small Office Wireless Network” |
| 2. Problem statement | What is wrong that needs fixing? | “Many students lose their data when their phone falls in water because they do not know how to clean the motherboard.” |
| 3. Objectives | What do you want to achieve? | “To identify short circuits on a water-damaged board.” “To recover lost files.” |
| 4. Methodology | How will you do it, step by step? | Open the phone, clean the board, test with a multimeter, then test the phone. |
| 5. Required materials | What tools and parts must you buy or borrow? | Multimeter, soldering iron, screwdriver set, replacement parts. |
| 6. Expected outcome | What will the final result look like? | “A fully functional smartphone with all original data recovered.” |
What is the difference between an objective and a methodology?
- Objective: a statement of what you want to achieve, usually starting with “To”.
- Methodology: the ordered steps you will follow to achieve it.
| Point | Objective | Methodology |
|---|---|---|
| Answers | What? | How? |
| Form | Short “To” statements | Steps in order |
| Example | To recover lost files | Connect the phone, run recovery steps, save the files |
Why must a proposal list required materials?
- Cost: it lets your supervisor judge whether you can afford the project.
- Availability: it shows you know where to buy or borrow each item.
- Safety: it shows whether you have the right protective gear.
How do you get your proposal approved?
Approval comes from a meeting with your supervisor, so you must prepare for it as well as hand over the paper.
Before the meeting
- Double-check your facts: if you say you need a specific IC chip, know where to buy it and how much it costs.
- Be ready for questions: your supervisor may ask “Why this project?” or “What will you do if this part is unavailable?”
- Stay calm: the questions test your thinking and help you improve the plan.
- Bring a clean copy: carry a neat printed or handwritten proposal.
During the meeting
- Take notes: if the supervisor suggests a change, write it down immediately.
- Be flexible: if they say your project is “too big”, listen. A small project done well is better than a huge project that never works.
- Be polite: greet properly, speak clearly and thank your supervisor.
Why do supervisors reject proposals?
A supervisor usually rejects a proposal for three reasons: vague ideas, high cost and safety risks.
- Vague ideas: “I want to fix computers” is too broad. Which computer? What fault?
- Too expensive: if your project costs ₦200,000 and you do not have the money, it cannot be approved.
- Safety risks: a project with dangerous high-voltage electricity and no safety gear is rejected for your protection.
What should you do if your proposal is rejected?
- Stay calm and do not argue.
- Ask: “Sir/Ma, what part should I change to make this work?”
- Write down the answer.
- Edit the proposal.
- Resubmit it for approval.
What should you check before submission?
Use this checklist to review your proposal before you ask for the “Approved” stamp.
- Name and class: are they clearly written?
- Six parts: are the title, problem, objectives, methodology, materials and outcome all present?
- Budget: did I include a simple budget?
- Time: did I state how long the work will take?
- Language: is the vocabulary simple enough for anyone to understand?
- Spelling: are technical terms such as oscilloscope and transistor spelt correctly?
What happens during supervision after approval?
Supervision is the guidance your supervisor gives you from approval until you present the finished project.
- Meet your supervisor at the times you agree.
- Show the work you have done so far.
- Keep a record of your work, such as a logbook or project diary.
- Follow safety rules: switch off and unplug devices before opening them, and work in a well-ventilated place when soldering.
- Report problems early, such as an unavailable part, so your supervisor can advise you.
- Write up your work and present or demonstrate the finished project.
Evaluation
- What is a project proposal?
- List the six parts of a good proposal.
- What is the difference between an objective and a methodology?
- Why should you always include a list of “Required materials” in your proposal?
- State the three common reasons a supervisor rejects a proposal.
Assignment
Prepare the opening part of a proposal for a repair job you would like to do as your final project.
- Write a project title.
- Write a one-sentence problem statement and two objectives that start with “To”.
- Your supervisor says the project is “too simple for an SS3 student”. Write two sentences on how you would make it more advanced.